Almost done with the bed....
The straps have been trimmed up, and we're looking good so far!

Now I need to remove the attachment points from the kit bed, and attach them to the new wood bed, this looks like a job for my Trumpeter Panel Scriber!

I slowly started cutting the attachments loose...

Both attachments free and cleaned up for installation on the wooden bed...

Mocked-up on the wooden bed, along with another piece of the c-channel styrene for the stiffener between the attchments

Here's the forward attachment epoxied in place in it's new home...

The stiffener epoxied down...

And the rear attachment epoxied down. The marks on the edges of the bed were slightly off, so I used the frame to line them up in the proper locations.

The straps were painted with Alclad Aluminum, I thought I had some Chrome, but noooo...

And a bit of touch-up painting of the attachment points and stiffener, the new wooden bed is now completed!