Jump to content
Model Cars Magazine Forum

Mack DM600 roll-off truck 11-08-15 update


Recommended Posts

The container is nearing completion. I was able to fabricate a working latch mechanism for the door. I have a set of diamond plate rear fenders (AITM) that will be used and when those are mounted, an auto tarp system will be installed. The tarp tower and gantry will be hydraulic:

IMG_1910_zpsiz6k9zzu-vi.jpgHosted on Fotki

IMG_1911_zpsocqvaz1j-vi.jpgHosted on Fotki

IMG_1912_zpsm3rbjhhf-vi.jpgHosted on Fotki

IMG_1913_zpszblyihen-vi.jpgHosted on Fotki

It’s time to start concentrating on the rest of the truck…completing the chassis, drive train and interior or at least try to :D

 

 

Edited by Tesla
Link to comment
Share on other sites

  • 4 weeks later...

10-06-15 update:

The ICC bumper is now complete. As you can see, it folds up in the tilted position:

IMG_0066_zpsb6pp20zv-vi.jpgHosted on Fotki

IMG_0065_zps2kopyu5x-vi.jpgHosted on Fotki

IMG_0063_zpsafhc9jnx-vi.jpgHosted on Fotki

The hood, cab and container were painted with Create “Airbrush Colors” opaque green:

IMG_0067_zpssoc9cph7-vi.jpgHosted on Fotki

Next will be completing all chassis parts and prep for paint...

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Edited by Tesla
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...