Tom Kren Posted September 30, 2015 Posted September 30, 2015 Ok saw somewhere on one of the boards about the building of the interior of the new 29 instuctions say one way but something doesn't work anyone have trouble with this issue???
Brett Barrow Posted September 30, 2015 Posted September 30, 2015 Only thing I can think of is the channeled version says use a different floor which is for a future variant while both versions should use the same floor. It's pretty obvious when test fitting that it's wrong it doesn't mate up to the firewall.