Here is my Advanced RM. Remains for fall post and tank rear, hydraulic system has the inside of the cab, one way and the weathering, and the strings..
A little idea of how it's going to be. One way will be a bigger series and one can more old
I finished the 1st phase of the RM.It is now ready to receive the equipment.I'll work on it until the end of the month and then stored it until the fall.I have to finish my Aeromax with trailer low and then the first of two big projects of the summer a Cat 660.
I had not planned to do a new transfercase.I predicted use one I had before either an auxiliary transmission converted transfercase.After thinking his was doing one can pin a hay as realistic.So I decided do some research on the transfercase mounted on the Macks.The result.