Hi everyone, got the wire wheels built, painted and mounted. Touched up a few bits on the front end as well. Also trial fitted the tin work. Starting on the motor assembly. Scratch built the manifold and idler pulley tensioner bracket.
Finally got back to the workbench a little this last week and made some progress. The body panels have been hand shaped from printers aluminium and I'll be attaching them with mini slotted screws.
Also got some color on the frame and I've started populating it with the running gear. Using R&M Motion bolts and lots of scratch built stuff.
Also used RB Motion valve stems for the rims.