ah man, now the pressure is on, lol. got the cab/hood/doors/fenders in primer in the dehydrator. I glued parts of the sleeper together for preparation of wash/sand before prime. I taped the sleeper together with the floor in place, then glued the front wall [the pass thru to the cab part] on one side to one side of a sleeper side, and glued the back wall to the opposite side sleeper side, I figure in this way I can sand/prime both inside and out at once, and have two halves, rather than fight to paint stuff inside a box, if that makes sense. also made some progress on the frame. will post up some pic's tomorrow.
thanks for following along.