I usually wait at least a couple of weeks. I try to let it cure for a month to be on the safe side. In the meantime I work on subassemblies like the engine or interior.
Sharp build. I saw a CHP Charger on the side of the freeway tonight as a I was driving home from Hobby Lobby. Good thing I was driving the speed limit.